Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3958.65
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jun 29, 2009     Wiring / plumbing grommets - (1.0 hour)       Category: Fuselage
I measured and laid out another wire for the aft fuselage -- this time the four-conductor tail strobe wire. I also drilled the hole in the aft bulkhead where this wire will pass through, and installed a grommet.

In the left gear tower, I installed an edge grommet in one of the remaining 1" holes where the fuel lines will pass through.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.